Sectors
The grid problem looks different in every sector
The constraint is the same grid. The problem, the trigger and the answer differ by sector.
Find your sector
Pick the one closest to yours to see the typical problem, what usually triggers it and where to start.
Fleets and depots
- Charging a fleet at depots with no spare capacity.
- Zero-emission zones, customer requirements, fleet renewal.
- A site-by-site electrification plan and programme support.
Logistics and ports
- Shore power and equipment electrification on multi-tenant sites.
- Emission rules and terminal expansion.
- Capacity allocation between tenants and a contract route with the grid operator.
Manufacturing, food and cold chain
- Expansion blocked by a full connection.
- New production lines or electrified processes.
- Flex contracts and using refrigeration as flexibility.
Construction and infrastructure contractors
- Power needed on site before the grid arrives.
- Emission-free requirements in tenders.
- Site energy plans that hold up in the tender and on site.
Film, TV and events
- Silent, low-emission power on location.
- Sustainability targets for productions.
- Power planning and on-site optimisation.
Public sector and business parks
- A shared capacity ceiling no single company can solve.
- Companies on the park blocked at the same time.
- Energy hub feasibility, allocation, governance and contracting.
Grid operators
- Processes not built for flexibility, CSPs and markets.
- Growing congestion areas and new contract types.
- Capability programmes, procurement and independent review.
Don't see your sector?
The grid is the same. Tell us your situation.

Bart Louwerenburg