Battery, Solar, Hybrid solution
48 KWh BatPack
Locquet Power & Light bvba
48 KWh BatPack

Main data

Nominal capacity:77 kWh
Effective capacity:46.2 kWh
Battery type:Lead Carbon
Voltage:400 V AC
Weight:32.400 kg
Year built:2018

48 KWh BatPack

Battery Pack 24 kVA 400V for at the construction sit office, pumps. Has integrated contact and control systems for automatic starting generators if necesarry. Solar frame or container can be added to recharge the batteries.

Transform the way you rent energy

Skoon get in touch

Let's talk about your challenge.

Want to know more about how mobile energy solutions can power your project? Get in touch!

Insights

Rotterdam, 17 May 2022 - Let's take a moment to see how batteries can solve shore power shortages. Shore power is an electrifying topic which can be a costly endeavour for some ship owners and ports. Although...
Rotterdam, 07 April 2022 - The problem of grid congestion has become increasingly urgent in many industrial areas in the Netherlands and neighbouring countries. While taskforces form and the grid operators...
Rotterdam, 25 February 2022 - Free shore power is now available on the Maaskade in Rotterdam for inland vessels of CEMT Class V and higher that participate in a trial concerning shore power reinforcements...
How battery systems solve shore power shortages
How battery systems solve shore power shortages
Rotterdam, 17 May 2022 - Let's take a moment to see how batteries can solve shore power shortages. Shore power is an electrifying topic which can be a costly endeavour for some ship owners and ports. Although...
Grid congestion solutions and how we can help
Grid congestion solutions and how we can help
Rotterdam, 07 April 2022 - The problem of grid congestion has become increasingly urgent in many industrial areas in the Netherlands and neighbouring countries. While taskforces form and the grid operators...
Battery installed to supply extra strong shore power for inland vessels
Battery installed to supply extra strong shore power for inland vessels
Rotterdam, 25 February 2022 - Free shore power is now available on the Maaskade in Rotterdam for inland vessels of CEMT Class V and higher that participate in a trial concerning shore power reinforcements...